Categories
Ministerial Decision

Ministry of Energy: Decision 4428/450201 regarding Licence 1 for the Natural Gas Distribution Company

Arabic

The Minister of Energy,

based on the powers entrusted to him by law, after perusal of the Energy Supply Law issued by Royal Decree D/80 4 Jumada Al-Thani 1444 [28 December 2022], and Ministerial Decision 1-1229-1440 of 27 Safar 1440 [5 November 2018], regarding the renewal of license 1 of the Natural Gas Distribution Company to build, own, and operate a dry gas distribution network in the second industrial city of Riyadh, and in pursuance of public interest,

hereby decides

First

The service area is hereby modified according to the limits shown in the map attached.

Second

The terms and conditions applicable in the licence and its annexes apply to all that is not stipulated in the amendments issued in this decision.

Third

This decision is subject to all the provisions of the orders, laws, regulations, instructions, procedures, relevant decisions, and any of its amendments.

Fourth

This decision comes into force on the date of its publication in the official gazette, and continues to be applicable until the contrary is issued. It repeals all decisions in conflict with it.

Fifth

This decision must be communicated to those who are required to implement it and act on it.

May Allah provide success.

Minister of Energy
Abdulaziz bin Salman bin Abdulaziz

Issued on: 17 Dhu Al-Qa’dah 1448
Corresponding to: 24 April 2027

Published in Umm Al-Qura 5037 issued on 5 July 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 4222/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Makkah Al-Mukarramah Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 3801/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Asir Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 3800/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Qassim Region

Arabic

The Minister of Energy,

based on the powers entrusted to him by law, and after perusal of clause Third of Royal Decree D/15 dated 11 Rabi Al-Awwal 1424 [13 May 2003], by which the Law of Expropriating of Real Estate for Public Benefit and Temporary Seizure of Real Estate “the Law” was issued, and the provisions of the law,

hereby decides

First

The commencement of the procedures for expropriating a part of the plot of land owned under Instrument 31/2/4 dated 7 Jumada Al-Thani 1418 [10 October 1997], located in the city of Buraidah, overlapping with the aerial line campus, with a voltage of 380 kV., which connects Station 9032 to the line connecting Station 9011 and 9025, with a total area of 4067.80 m2 (Forty thousand sixty-seven square meters and eighty square centimeters), in accordance with the attached cadastral decision, for the benefit of the Saudi Electricity Company.

Second

The Saudi Electricity Company shall notify this decision to the relevant entities referred to in articles 6 and 7 of the law, in order to nominate its representatives in each of the Real Estate Description and Inventory Committee and the Real Estate Compensation Estimation Committee, within a period not exceeding 15 (fifteen) days from the issuance of this decision. The company shall call for the meetings, prepare the minutes, and take the necessary measures to carry out each committee’s tasks.

Third

The Saudi Electricity Company shall notify the owners of the rights over the real estate whose expropriation is decided of the compensation estimated to them, and it shall also inform the owners and occupants of the real estate that it must be vacated within the period specified by the company, provided that it is not less than 30 (thirty) days from the date of notification of the eviction, in accordance with the provisions of articles 16 and 17 of the law.

Fourth

The Saudi Electricity Company shall pay compensation to rights holders in accordance with the decision of the Real Estate Compensation Estimation Committee, and the disbursement procedures shall be carried out before the date specified for vacating the property, provided that the amount of compensation is not delivered to its owner until after the delivery of the property, and it is documented by the notary public or the court. The compensation must be disbursed within two years from the date of the decision approving the commencement of the expropriation procedures in accordance with the provisions of article 18 of the Law.

Fifth

It is permitted for stakeholders to file a grievance before the board of grievances against the decisions made by the committees, in accordance with the system, within 60 (sixty) days from the date they are notified of the decision.

Sixth

This decision must be published in the official gazette and in two daily newspapers distributed in the region. A copy of the announcement must also be posted at the headquarters of the company, at the headquarters of the project, in the court, in the emirate, governorate, or center, and in the municipality in whose jurisdiction the property is located.

Seventh

This decision must be communicated to those who are required to implement it and act on it.

Minister of Energy
Abdulaziz bin Salman bin Abdulaziz

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 3799/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Makkah Al-Mukarramah Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 3798/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Riyadh Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 4225/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Makkah Al-Mukarramah Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 4227/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Makkah Al-Mukarramah Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 4224/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Riyadh Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.

Categories
Ministerial Decision

Ministry of Energy: Decision 4223/450201 Expropriating in Order to Enhance the Reliability of the Electricity Network in Hail Region

Arabic Auto Translate

Issued on: 6 Shawwal 1445
Corresponding to: 15 April 2024

Published in Umm Al-Qura 5035 issued on 7 June 2024.